Electrified Double Track Project. Ipoh-Padang Besar
Fact Find
View track alignment.  Site Map.
 
About Us
 

MMC-Gamuda Joint Venture Sdn Bhd, is a 50:50 joint venture company between MMC Corporation Berhad and Gamuda Berhad. The joint venture company will design and build the Electrified Double Track Project and the project will involve the construction of infrastructure works, track and system works on a 5-year Design and Build Contract.

What is the Electrified Double Track Ipoh-Padang Besar project?
The Electrified Double Track project is a 329-km northern railway project that integrates with KTM’s main line from Ipoh to Johor Bahru. When completed in 2013, the entire electrified dual tracks will stretch 968-km from south to north of Peninsular Malaysia.

Our Proponents
Click on the company below to view corporate profile.

 

 

 
MMC-Gamuda Joint Venture Sdn Bhd © Copyright Protected. Powered by Orangutan Solutions. Privacy Notice | Disclaimer Notice